Background In 2024, a dispute arose concerning the design and construction of a hyperscale data centre in Europe. The developer alleged delays and design deficiencies…
Background In 2024, a major fire occurred in a data centre in Asia, causing extensive damage to the electrical infrastructure alongside other critical building systems….
Background Three segments of stainless-steel waste disposal piping, damaged by pitting and subsequent leakage, were submitted to the Rimkus Materials Testing and Investigation laboratory team…
Background Four fractured zinc-plated hex bolts were sent to the Rimkus Materials Testing and Investigation laboratory team after an in-service failure occurred. Our materials experts…