Background The project involved a double-deck road tunnel that connects Europe to Asia, significantly reducing travel time between the two continents. The tunnel was a…
Background The project involved a run-of-the-river plant located in the country of Georgia. Construction on the project began in 2013 and was completed in April…
Background Three segments of stainless-steel waste disposal piping, damaged by pitting and subsequent leakage, were submitted to the Rimkus Materials Testing and Investigation laboratory team…
Background Four fractured zinc-plated hex bolts were sent to the Rimkus Materials Testing and Investigation laboratory team after an in-service failure occurred. Our materials experts…
Background The Rimkus Materials Testing and Investigation laboratory team was tasked with investigating a fractured nickel-plated brass adapter fitting connecting a water hammer arrester to…
Background A developer had plans to build a new hotel with a significant entertainment component. Since the design featured two nightclubs in the same building,…
Background The client, a national pension fund advisor, was in the process of purchasing a Class-A commercial office tower on behalf of an institutional pension…
Background Rimkus experts were engaged to manage the development of a new high-rise residential tower. Our client, an institutional equity fund, needed a partner to…
Background Rimkus experts worked with a large developer and general contractor to restore and rebuild a historic brick building façade in a coastal location. The…
Background Rimkus experts were engaged to provide sustainability consulting for a new, large children’s social services facility. The project included a gym and fitness center,…
Background The client needed a fast-track design for a new, 500,000-square-foot, mission-critical office building. The project required careful coordination with the needs of the building…