Land Development Flooding
May 19, 2022
Background
Commercial land development project reportedly caused flooding of an adjacent residential neighborhood due to the renovation of a levee and haul road.
Services Provided
Rimkus was retained to evaluate the cause of flooding and provided solutions to mitigate offsite drainage. Rimkus utilized its hydrology and design and construction experience with drainage systems to determine drainage issues and solutions. The scope of work encompassed the following.
- Conducted on-site inspection of the levee, haul road, drainage, and adjacent residential properties.
- Reviewed of site documents of the commercial property.
- Interviewed representatives from the commercial property.
- Review of weather data.
- Reviewed drainage patterns.
Sorry, no posts matched your criteria.