Background Originally built in the 1920’s, St Sampsons Terminal in Guernsey is a fuel terminal covering over 129,000 sq. ft. The terminal comprises 10 main…
Background The Rimkus team assisted on a project related to the design and construction for the stabilisation and upgrading of an existing offloading jetty for…
Background Rimkus was retained to provide commercial services for a £15 million manufacturing facility specializing in the production of personal care products in the North…
Background The client retained Rimkus for projects in varying sizes and complexity at a large chemical processing plant, ranging from simple roof maintenance works to…
Background A major international investment fund needed due diligence services to support the acquisition of a 117-million-square-foot, 650-property commercial purchase. Services Provided Rimkus experts were…
Background A major developer of large-scale commercial properties needed a trusted, long-term partner to manage projects covering a wide variety of types and sizes—from large-scale…
Background A river followed a natural path that passed through a golf course. In 2011, flooding from a hurricane caused significant erosion and damage that…
Background A ruptured cylinder from a fire suppression system was received by the Rimkus Materials Testing and Investigation team for analysis to determine the cause…
Background A 300M ultra-high strength steel transmission input shaft fractured during a NASCAR race after approximately 254 miles. A metallurgical failure analysis was performed by…
Background Two 90-degree brass plumbing fittings were received by the Rimkus Materials Testing and Investigation team for a corrosion investigation to determine the extent of…