Background
A developer had plans to build a new hotel with a significant entertainment component. Since the design featured two nightclubs in the same building, a variety of specialized assembly permits needed to be created and filed with the fire department. Adding to the challenge, the permits were required to be approved within just two weeks to stay on schedule.
Services Provided
The Rimkus team quickly developed a plan to meet the stringent code requirements for maximizing the occupant load while maintaining the desired seating and standing layout. We also advised the architect on interior finishes to meet the unique local fire code requirements.
The assembly permit drawings were submitted to the fire department promptly and were approved within two weeks, keeping the project on schedule.