Case Study Overview Following a successful building enclosure design review during Phase 1, a client returned to Rimkus during Phase 2 to request another review…
Case Study Overview Before a new K-12 school broke ground in Texas, an independent, third-party review of the building’s water, air, and thermal barrier design…
Case Study Overview When a residential community operator identified water intrusion across two adjacent post-tensioned concrete parking garages, the Rimkus Built Environment Solutions (BES) team…
Case Study Overview When a multi-story residential community began experiencing water intrusion and cracking in its below-grade parking structure, the Rimkus Built Environment Solutions team…
Case Study Overview When concrete spalling and water intrusion began appearing throughout a decades-old pre-cast parking structure, the Rimkus Built Environment Solutions (BES) team was…