Background
The client needed a fast-track design for a new, 500,000-square-foot, mission-critical office building. The project required careful coordination with the needs of the building owner, the contractor, and the building tenant.
Services Provided
Rimkus experts provided full mechanical, electrical, plumbing, and fire protection (MEP/FP) system design and commissioning services. Our team worked closely with the general contractor and pre-selected MEP/FP contractors to enable rapid ordering of major equipment, avoiding delays. We also coordinated infrastructure installation with the structural engineer and architect before final construction plans were complete.
By facilitating a successful collaboration, our consultants helped advance the construction to meet the tight schedule, while still providing high-quality design and functional systems. Our commissioning and LEED consulting experts oversaw the validation and LEED certification of the entire project to help ensure strategic objectives were met.