Québec Building Safety Regulations Overview
Québec is the only Canadian province with a province-wide regulatory framework requiring periodic façade inspections of existing buildings. Under the Building Chapter of the Québec Building Board (RBQ) Safety Code, owners of buildings 5 storeys or more must obtain a façade verification report from a licensed engineer or architect every 5 years, beginning no later than the 10th anniversary of construction.
The Building Act (CQLR, c. B-1.1), also known as Bill 122, has been in force since March 18, 2013 and includes fines for non-compliance. Building owners are responsible for ensuring inspections are performed and remedial work is completed. Multi-level parking structures are subject to separate but parallel requirements.
Source: RBQ Safety Code, Building Chapter; Building Act (CQLR, c. B-1.1)
Québec Building Safety Regulations at a Glance
|
Requirement |
Applies To |
First Inspection |
Frequency |
Professional Required |
|---|---|---|---|---|
|
Façade Verification Report |
Buildings of 5 or more storeys above ground falling within the occupancy categories covered by the RBQ Safety Code, Building Chapter (including residential, commercial, institutional, and co-ownership buildings) |
By the 10th anniversary of construction |
Every 5 years |
Architect or engineer (OIQ or OAQ member) |
|
Parking Structure Inspection |
Underground or aboveground multistorey garages whose drivable portion is not laid directly on the ground |
12 to 18 months after construction |
Every 5 years |
Professional engineer (OIQ member only) |
|
Maintenance Register |
All buildings subject to façade or parking structure requirements |
At time of first inspection |
Ongoing |
Maintained by owner; available to RBQ on request |
Bill 122: Requirements, Deadlines, and Dangerous Condition Protocol
Key Definitions Used
Building Height
- A building with at least one façade of 5 storeys or more above ground, falling within the occupancy categories covered by the Building Chapter of the RBQ Safety Code
- Applies regardless of construction year or age
Verification Report
- A report signed by a licensed engineer or architect certifying that façades show no dangerous conditions
- The physical examination must occur no earlier than 6 months before the report date
Qualified Professional for Façade Reports
- A licensed architect (OAQ member) or licensed engineer (OIQ member)
- OAQ: Order of Architects of Québec
- OIQ: Order of Engineers of Québec
Qualified Professional for Parking Inspections
- A licensed professional engineer (OIQ member) only
- Architects are not qualified for parking structure inspections under Bill 122
Occupancy Categories
- Residential multi-unit buildings, commercial buildings, institutional buildings, co-ownership (condominium) buildings, and heritage buildings meeting the applicable occupancy thresholds

Verification Report Requirements
- Name, signature, and contact information of the professional who performed the inspection
- Description of inspection methods and scope
- Location and description of defects identified, and their probable causes
- Assessment of connectors, ties, and anchoring systems
- Summary confirming the absence of dangerous conditions, or recommendations for remedial work
- Photographs and supporting documentation
The verification report must be filed in the building’s maintenance register and kept on the premises, available to the RBQ on request. The register must also contain the results of all periodic inspections, repair documentation, and any records relating to dangerous conditions.
Source: RBQ Safety Code, Building Chapter
Dangerous Condition Protocol
A ‘dangerous condition’ is any defect or situation that could compromise the safety of occupants or the public. The RBQ has authority to order emergency measures and compel remediation under the Building Act (CQLR, c. B-1.1). When a professional identifies a dangerous condition during an inspection, the following protocol applies to both façade and parking structure inspections.
|
Timeline |
Trigger |
Required Action |
|---|---|---|
|
Immediate |
Professional identifies dangerous condition |
Must notify the building owner and the RBQ immediately |
|
Immediate |
Owner receives notification |
Set up emergency safety measures and notify the RBQ immediately |
|
Within 30 days |
Owner files with RBQ |
Complete RBQ ‘Reporting a Dangerous Condition’ form; provide written description of remedial action and completion schedule, subject to RBQ approval |
|
Ongoing |
Owner carries out remedial work |
RBQ may order additional measures if remediation plan is deemed insufficient |
Penalties and Consequences
Non-compliance with Bill 122
- Fines and enforcement measures under the Building Act (CQLR, c. B-1.1), administered by the RBQ
- The RBQ may order emergency measures and compel remediation at the owner’s expense if a dangerous condition is not addressed
- Owners who fail to maintain the required register or obtain the required reports are subject to RBQ enforcement action
- Civil liability exposure
- Building owners have a duty of care toward occupants and the public
- Failure to comply with mandatory inspection requirements is relevant to any liability claim arising from a façade or structural failure
- Insurance implications
- Carriers increasingly review inspection compliance records during policy renewal
Québec’s Bill 122 Deadlines are Tied to Your Building’s Construction Date
Rimkus’ licensed engineers and architects serve building owners, property managers, and condominium syndicates across Québec. Whether your inspection deadline is approaching or you need guidance on register and report requirements, the Rimkus Montreal team is ready to help.
How Rimkus Can Help
- Façade verification inspections and reports under the RBQ Safety Code, Building Chapter
- Parking structure inspections for multi-level structures with elevated concrete slabs
- Maintenance register documentation and capital planning guidance
- Dangerous condition assessment and emergency remediation support
- Restoration design and repair specifications
Schedule a Québec Building Safety Consultation
Frequently Asked Questions
Need Help? Contact Rimkus
Bill 122 deadlines are tied to your building’s construction date and cannot be deferred. Rimkus’ Montreal engineers and architects are ready to assess your building, produce the required verification report, and help you stay ahead of your obligations under the RBQ Safety Code.
Schedule a Consultation
- Phone: +1 514 439 6465
- Toll free: +1 888 607 5245
- Email: [email protected]
Additional Insights on Québec Regulations
External Resources
- Façades: Maintenance and Inspection | RBQ
- Parking Structures: Maintenance and Inspection | RBQ
- Building Act (CQLR, c. B-1.1) | LegisQuébec
- Bill 122, An Act to Amend the Building Act, March 18, 2013 | National Assembly of Québec
- Order of Engineers of Québec (OIQ)
- Order of Architects of Québec (OAQ)
- Québec Construction Code | RBQ
- Civil Code of Québec (Articles 1039 to 1109) | LegisQuébec